Français
GHG CleanProjects(R) Registry

Project Details

Title: Forest Harvesting Direct GHG Reduction Project Identifier: 5345-7771

Project Description

The baseline condition for harvesting practices consists of the traditional full tree harvest system with tree length hauling which is still practiced throughout Alberta. The project condition consists of the application of portable chipping technology that replaces centralized wood room chipping, requires less wood handling, and results in 20% uplift in tree utilization with a corresponding reduction in harvest debris disposal. In the 2002 harvest season a pilot portable chipping program was implemented. Success of the pilot program lead to a rapid expansion of portable chipping, and full implementation of portable chipping was achieved in 2005 (project start)

Project Files

Alberta - GHG Report (2005-2010) - english
Alberta - Verification Report (2005-2010)
Alberta - Notice of Creation (2005-2010)
Alberta - GHG Report (2010) - english
Alberta - Notice of Creation (2010) - english
Alberta - Verification Report (2010) - english
Alberta - Project Report (2011-2012)
Alberta - Project Plan (Project #5345-7771)
Alberta - GHG Assertion (2011-2012)
Alberta - Verification Report (2011-2012)
Alberta - GHG Report (2012-2013)
Alberta - Verification Report (2012-2013)
Alberta - GHG Assertion (2012-2013)
Alberta - Project Extension Approval Letter (2014)
Registry: Alberta Emissions Offset Registry  
Type: Change in Forest Harvest Practice Status: Active
Authorized Project Contact: None defined Latitude: None Defined
Validator: None defined Longitude: None Defined
Verifier: KPMG Performance Registrar Inc.
Project Proponent: Daishowa-Marubeni International-Peace River Pulp Division
Start Date: 2005-05-01 End Date: 2017-04-30
Estimated potential lifetime emission reductions-removals: 1,105,000 t CO2e Estimated potential annual emission reductions-removals: 85,000 t CO2 e
Serial Number Ascending VERR
Vintage Year Descending
Company Name Unsorted Status Unsorted Quantity in
t CO2 e Unsorted
5345-7771-000-000-218-086 to 5345-7771-000-000-309-367 2009 Alberta Power (2000) Ltd. Retired 91,282
5345-7771-000-000-157-838 to 5345-7771-000-000-218-085 2008 Alberta Power (2000) Ltd. Retired 60,248
5345-7771-000-000-309-368 to 5345-7771-000-000-421-043 2007 Alberta Power (2000) Ltd. Retired 111,676
5345-7771-000-000-055-006 to 5345-7771-000-000-157-837 2006 Alberta Power (2000) Ltd. Retired 102,832
5345-7771-000-000-000-001 to 5345-7771-000-000-055-005 2005 Alberta Power (2000) Ltd. Retired 55,005
5345-7771-000-005-790-785 to 5345-7771-000-005-794-284 2012 Imperial Oil Pending Retirement 3,500
5345-7771-000-005-794-285 to 5345-7771-000-005-923-010 2012 Capital Power LP Pending Retirement 128,726
5345-7771-000-001-913-371 to 5345-7771-000-002-049-784 2011 Capital Power LP Pending Retirement 136,414
5345-7771-000-000-421-044 to 5345-7771-000-000-530-005 2010 Capital Power LP Pending Retirement 108,962
Total Serialized VERRs for this project that have been Retired: 421,043 , Pending Retirement: 377,602

Search within the
GHG CleanProjects® Registry

Click Here

Disclaimer